Upper Yarra Dam Safety Upgrade

Upper Yarra Dam Safety Upgrade

EDG is assisting Seymour-Whyte with specialist earthworks advice on the Upper Yarra Dam Safety Upgrade. We have provided materials specification and temporary batter design support, along with assessments of existing underground infrastructure and dewatering requirements.

North West Program Alliance – Bell Moreland

North-West-Program

EDG provided temporary works design for the Bell Moreland Level Crossing Removal Project in Melbourne, comprising construction hardstands for piling rigs, cranes and mobile gantries in a constrained site. As part of the hardstand design, we assessed and designed protection to over 80 underground services, ranging from degraded water mains to large diameter sewers, for […]

Inland Rail Tender

Inland Rail Tender

EDG was part of the CPB/Ghella/UGL bid for the Gowrie to Kagaru Inland Rail project, which was a 128km heavy freight rail line to be constructed through extremely challenging topographical and geological conditions in south-east Queensland. Our services included ground model development, geohazard assessment, tender design of cuts and fills (including design of ground treatments […]

Kingsford Smith Drive Upgrade

Kingsford Smith Drive Upgrade

Lendlease Engineering is delivering Brisbane City Council’s Kingsford Smith Drive Upgrade project in Brisbane. The project is to be delivered adjacent to live traffic on the major arterial road and along the northern bank of the Brisbane River. EDG Consulting is assisting Lendlease in the temporary works field. We have delivered over 45 temporary works […]

Kuranda Range Slope Stabilisation Works

Kuranda Range Slope Stabilisation Works

Queensland Rail commissioned Geovert Ground Engineering to deliver the design and construction of slope stabilisation works for selected sites on the Kuranda Scenic Rail line, near Cairns. A number of sites along the Kuranda Range had been identified for remedial works following a risk assessment study undertaken previously. EDG Consulting was been engaged by Geovert […]

Western Roads Upgrade – Project 8 Duncans Road

Western Roads Upgrade – Project 8 Duncans Road

Construction for new bridges at the Project 8 site was constrained by existing road embankments and major underground pipelines.  EDG developed a temporary retaining wall and batter designs that minimised impact to the existing infrastructure and allowed unconstrained construction of the permanent works.

Auckland Hill Slope Risk Assessment, Gladstone

Aukland-Hill-Slope-Assessment

Auckland Hill is a council reserve located on the south-east entrance to Gladstone Harbour.  The slopes of Auckland Hill, which have a history of instability, fall to parklands and public space below. EDG undertook a slope stability risk assessment of this area. Following on site hazard identification and characterisation, the calculation of risk requires an […]

Slope Risk Assessments

Slopes-RiskAssessment

EDG regularly provides slope risk assessment services for the TMR Queensland road network. We have carried out assessments across Queensland. Including the Warrego Highway at Marburg and Toowoomba, within Lamington National Park, Cunningham’s Highway, Burnett Highway, Mount Tambourine, Boonah-Rathdowny Road, Paluma Range National Park and on Sarina Range. We have four fully accredited RMS slope […]

Gateway Upgrade North

Gateway Upgrade North

Lendlease Engineering is delivering the Gateway Upgrade North project between Nudgee and Deagon. EDG Consulting is assisting Lendlease by providing temporary works design and geotechnical engineering services during construction. We have completed design works for over 60 temporary works packages for the project, including:  Excavation and excavation support Crane and piling rigs working platforms Slope […]

Cape Conran Boat Ramp and Jetty Upgrade

Cape Conran

EDG provided geotechnical investigation, ground characterisation and concept pile design advice for the upgrade of the existing boat ramp and jetty at Cape Conran.  We assisted the client in scoping the investigation and geophysical survey, then performed the geotechnical fieldwork and mapping.