Kuranda Range Slope Stabilisation Works

Kuranda Range Slope Stabilisation Works

Queensland Rail commissioned Geovert Ground Engineering to deliver the design and construction of slope stabilisation works for selected sites on the Kuranda Scenic Rail line, near Cairns. A number of sites along the Kuranda Range had been identified for remedial works following a risk assessment study undertaken previously. EDG Consulting was been engaged by Geovert […]

Western Roads Upgrade – Project 8 Duncans Road

Western Roads Upgrade – Project 8 Duncans Road

Construction for new bridges at the Project 8 site was constrained by existing road embankments and major underground pipelines.  EDG developed a temporary retaining wall and batter designs that minimised impact to the existing infrastructure and allowed unconstrained construction of the permanent works.

Auckland Hill Slope Risk Assessment, Gladstone

Aukland-Hill-Slope-Assessment

Auckland Hill is a council reserve located on the south-east entrance to Gladstone Harbour.  The slopes of Auckland Hill, which have a history of instability, fall to parklands and public space below. EDG undertook a slope stability risk assessment of this area. Following on site hazard identification and characterisation, the calculation of risk requires an […]

Slope Risk Assessments

Slope-Risk-Assessment

EDG regularly provides slope risk assessment services for the TMR Queensland road network. We have carried out assessments across Queensland. Including the Warrego Highway at Marburg and Toowoomba, within Lamington National Park, Cunningham’s Highway, Paluma Range National Park and on Sarina Range. We have three fully accredited RMS slope risk assessors within the business, and […]

Gateway Upgrade North

Gateway Upgrade North

Lendlease Engineering is delivering the Gateway Upgrade North project between Nudgee and Deagon. EDG Consulting is assisting Lendlease by providing temporary works design and geotechnical engineering services during construction. We have completed design works for over 60 temporary works packages for the project, including:  Excavation and excavation support Crane and piling rigs working platforms Slope […]

Cape Conran Boat Ramp and Jetty Upgrade

Cape Conran

EDG provided geotechnical investigation, ground characterisation and concept pile design advice for the upgrade of the existing boat ramp and jetty at Cape Conran.  We assisted the client in scoping the investigation and geophysical survey, then performed the geotechnical fieldwork and mapping.

Eungella Range

Eungella Range

EDG was engaged to provide construction phase services for the installation of soil nails on a section of the Eungella Range, west of Mackay, where indications of instability had been observed. EDG staff were on site to observe soil nail construction including logging, soil nail testing, QA/QC records, ground model interpretation and liaison with the […]

Cooroy to Curra – Section C Project

Cooroy to Curra Section C alignment

Cooroy to Curra – Section C Tender Stage Excavatability and GeoMaterial Re-use Assessment EDG assisted Leighton Contractors with their successful tender for the construct only Cooroy to Curra – Section C project.  Geotechnical assessments relating to excavatability and geomaterial re-use were carried out, providing information to feed into the project mass haul.  The major ‘contractor […]

Lions Head Park Slope Stabilisation

Lions Head Park Slope Stabilisation

SRG Limited has recently completed slope stabilisation works at Lions Head Park on the Gold Coast on behalf of Gold Coast City Council. Stabilisation of the 500m long and up to 40m high face included devegetation and scaling of loose blocks, installation of rock dowels, soil nails, 170m of rock fall barrier and rock fall […]

Tallebudgera Creek Walking Track Landslide

Tallebudgera

The Tallebudgera Creek walking track is located within the Tallebudgera Creek Conservation Park, in Burleigh Heads QLD. EDG undertook a slope stability risk assessment of this area, following the reactivation of a small landslide during heavy rainfall. EDG worked to understand the slope instability risks posed to users of the walking track, as well as […]