Eton Range Realignment Project
Fulton Hogan is delivering the Eton Range Realignment project on the Peak Downs Highway, west of Mackay. This project involves widening to four road lanes, a split carriageway reduction in grade and partial realignment of the existing Eton Range crossing. EDG Consulting has been commissioned by Fulton Hogan as the Contractor’s Geotechnical Representative, providing geotechnical […]
Sarina Range Reconstruction Works
The 2km long Sarina Range crossing section of the Marlborough-Sarina Road was devastated by landslides from heavy rainfall during Cyclone Debbie in April 2017. EDG was engaged by TMR to provide remedial works designs for 25 affected sites on the road. We worked with TMR to develop appropriate design standards for the reconstruction works that […]
Southern Program Alliance
EDG is supporting the Southern Program Alliance with temporary works designs for grade separations on the Level Crossing Removal Project. We have provided working platform designs, temporary excavation stability assessments, temporary shafts and retaining wall designs, impact assessments for underground services and proof engineering services across the Carrum, Cheltenham and Mentone station, and Edithvale to […]
West Gate Tunnel Project
EDG provided temporary works design for CPBJH JV on the West Gate Tunnel Project in Melbourne. The temporary works comprised working platform design for up to 700t crane lifts over Coode Island Silt and assessments of impact to underground services. The design utilised 2D and 3D finite element analysis to confirm the load distribution through […]
Monash Freeway Upgrade Stage 2
EDG is providing temporary works design for CPB Contractors on the Monash Freeway Upgrade Stage 2 project in Melbourne. We have designed working platforms, crane hardstands and temporary excavations for pile caps adjacent to waterways, services installation and underbore construction. We have also assessed the capacity of existing reinforced soil structures to support piling rig […]
Upper Yarra Dam Safety Upgrade
EDG is assisting Seymour-Whyte with specialist earthworks advice on the Upper Yarra Dam Safety Upgrade. We have provided materials specification and temporary batter design support, along with assessments of existing underground infrastructure and dewatering requirements.
North West Program Alliance – Bell Moreland
EDG provided temporary works design for the Bell Moreland Level Crossing Removal Project in Melbourne, comprising construction hardstands for piling rigs, cranes and mobile gantries in a constrained site. As part of the hardstand design, we assessed and designed protection to over 80 underground services, ranging from degraded water mains to large diameter sewers, for […]
Kingsford Smith Drive Upgrade
Lendlease Engineering is delivering Brisbane City Council’s Kingsford Smith Drive Upgrade project in Brisbane. The project is to be delivered adjacent to live traffic on the major arterial road and along the northern bank of the Brisbane River. EDG Consulting is assisting Lendlease in the temporary works field. We have delivered over 45 temporary works […]
Kuranda Range Slope Stabilisation Works
Queensland Rail commissioned Geovert Ground Engineering to deliver the design and construction of slope stabilisation works for selected sites on the Kuranda Scenic Rail line, near Cairns. A number of sites along the Kuranda Range had been identified for remedial works following a risk assessment study undertaken previously. EDG Consulting was been engaged by Geovert […]
Western Roads Upgrade – Project 8 Duncans Road
Construction for new bridges at the Project 8 site was constrained by existing road embankments and major underground pipelines. EDG developed a temporary retaining wall and batter designs that minimised impact to the existing infrastructure and allowed unconstrained construction of the permanent works.