Lendlease Engineering is delivering the Gateway Upgrade North project between Nudgee and Deagon. EDG Consulting is assisting Lendlease by providing temporary works design and geotechnical engineering services during construction.
We have completed design works for over 60 temporary works packages for the project, including:
- Excavation and excavation support
- Crane and piling rigs working platforms
- Slope stability assessments
- Geotechnical observation and assessment of bridge pile construction
- Advice on construction methodology.
For each design package we have developed site specific ground models relevant to the construction approach and, where required, we have been involved during construction to confirm the existing conditions.