The Department of Transport and Mains Roads (TMR) recently engaged EDG Consulting to provide remedial designs for two separate road embankments within the wide Bay/Burnette region, which were damaged during intense and prolonged rainfall events. This included assessment of the damaged sections of embankment and development of remedial designs including:
EDG was onsite during the construction phase of the works to assist with quality control and engineering oversight. We also assessed the final landform using three-dimensional modelling software to confirm consistency with the facilities design storage requirements.
