BP has recently completed modification works at its former Brisbane Refinery as part of the refinery decommissioning. The works, which have formed part of the overarching de-energisation, decontamination and isolation refinery transformation project, included modification of the existing waste water treatment plant, into a multi-celled site stormwater management facility. During this process, EDG Consulting assisted BP with the following aspects of the project:
EDG was onsite during the construction phase of the works to assist with quality control and engineering oversight. We also assessed the final landform using three-dimensional modelling software to confirm consistency with the facilities design storage requirements.